Having provided full structural calculation for the design, Glass Structures Limited attended a site meeting to undertake a 3D survey. Working from drawing everything was put in production to allow the contactor to procced with all surrounding building works. As all of the 'stand-off' fittings factory welded the tolerances was minimal. After apply the purpose made Satin stainless Steel (316) sider fittings the team moved onto the glazing.